Skip to content

Template

Content batching template

Batching trades a little upfront planning for a lot of saved context-switching: instead of creating one post a day, you plan a session that produces a week or a month of content in one sitting. This template lays out what to decide before the session starts, so the session itself is pure production.

All guides

By The SkedCast Team · Updated · 5 min read

Key takeaways

  • Decide the batch scope (how many pieces, which pillars, which formats) BEFORE the session — deciding while creating is what makes batching slow.
  • Group by format, not by day: shoot every photo first, then every short video, then write every caption — switching activity type is the real time cost, not switching topic.
  • A batch session ends with a stack of drafts ready for scheduling, not finished posts — captions and final edits can happen in a separate, shorter pass.

Content batching template: before the session: decide the scope

  • Batch size — how many pieces of content this session should produce (a week's worth or a month's worth)
  • Pillar mix — how many pieces per content pillar, so the batch does not skew toward whatever is easiest to shoot that day
  • Format list — which formats are in scope (static post, carousel, short video, Story) since each has its own setup
  • Raw materials — what needs to be gathered beforehand: props, locations, screen recordings, data for a chart

During the session: batch by activity, not by post

The efficiency gain comes from doing one type of work repeatedly rather than switching types for every single post: shoot all the photos for the batch first, then record all the short video clips, then write every caption in one pass. Switching between shooting, editing and writing is the real time cost — switching between topics within the same activity barely matters.

After the session: hand off to scheduling

A batch session should end with a stack of raw or lightly-edited drafts, not fully polished, scheduled posts — save final caption edits and scheduling for a separate, shorter pass using the content calendar template, so the batch session itself stays focused on production.

content batchingtemplateworkflow

FAQ

How much content should one batching session produce?
A week is a manageable starting point; once the workflow feels smooth, many teams stretch a single session to a full month.
Should I write captions during the batch session?
Not necessarily — many teams save caption writing for a separate pass immediately after, since writing is a different mode of work than shooting or recording.
Does batching work for video content?
Yes, and it saves more time there than anywhere else — recording several short videos back to back in one setup avoids repeatedly re-lighting, re-miking and re-framing a shot.
What if I run out of ideas mid-batch?
That is what the pillar mix decided beforehand is for — pull the next idea from whichever pillar is under-represented in the batch so far, rather than improvising.

Ready to broadcast everywhere?

Sign up free — no credit card. You land on the Free plan, and you can start a one-time 7-day Studio trial from your workspace whenever you are ready. Connect your first accounts, import a batch, and watch one post fan out across every platform.